Visual inspection for manufactured parts

Which vision inspection setup fits your part?

Share your part and the defect you need to catch. We’ll outline which inspection approach to evaluate first, what supplier evidence supports it, and what to test on your samples.

Industrial inspection setup
Illustration · Directional lighting on a machined housing

Why MentiVision

Engineering decision support for industrial vision

Supplier leads screened
805
Supplier sites reviewed in depth
42
Hardware models indexed
133

We help engineering and procurement teams decide which approach fits a part, a tolerance and a production line. We compare the options, explain what would rule each one out, and identify which test could change the decision.

Our research on Chinese industrial vision suppliers gives the recommendation a concrete basis: model specifications, application examples and documented limitations. We flag what is known, what depends on your samples and what a supplier still needs to confirm.

What an application review gives you

  • A route to evaluate first
  • The trade-offs and evidence behind it
  • A test that can change the decision

The inspection example uses the HIKROBOT smart camera’s 12 MP specification, SinceVision’s 55 mm profiler reference distance and Yuezhan’s fastener sorting architecture to make the comparison concrete.

See an example review →See how the station fits together →
What these figures cover

November 2026 research: 805 deduplicated leads screened against the application scope, 42 candidate sites reviewed in more depth and 133 hardware model records indexed from manufacturer materials. The index includes 106 area-scan models from one manufacturer.

We also mapped nine public support, testing and integration leads in the US and Japan. For a live project, we check which provider can take the work and confirm scope, availability and responsibility before any handoff.

What you get from a review →How we can help →

What you gain before committing to equipment

Get a route shortlist, the evidence behind it and the next test from one project brief.

Screen in less engineering time

Compare published specifications and rule out poor fits before starting separate supplier conversations.

See the routes worth comparing

The burr example compares three routes: 2D imaging, 3D profiling and an integrated sorting station. A shortlist depends on which routes fit your application.

See the costs that change the decision

Compare equipment, fixtures, software, integration and support on the same scope. Spot scope differences before you decide which quotes to pursue.

Reuse one project brief

Share the part, acceptance rule and line constraints once. Use the same summary to brief your team, request quotes and plan a sample test.

See how the review applies to a project →

Decide what to test before requesting quotes

Compare options against your part

Use the same defect, field of view and cycle-time requirements to compare supplier approaches.

See the evidence behind each option

Use published specifications and application examples to screen options for your setup.

Know what a sample test must prove

Pin down the acceptance measures and the questions to resolve with a supplier or integrator before purchasing.

Compare the selection criteria ↓

Explore three inspection tasks

Compare how each task works, what the manufacturer materials support, and what to verify with real parts.

Choose by the acceptance decision. Visible marks and surface condition go under surface inspection. A measured value against a tolerance goes under dimension and profile. Presence, position or orientation of assembled components goes under assembly verification.

  1. Lighting & image
  2. Detect or measure
  3. Accept or reject
Inspect surface condition
Close-up of a machined bore under directional illumination
Illustrative process · 2D surface image · edge under inspection
How it works
Use controlled lighting to turn a scratch, burr or stain into a repeatable image feature. Choose the lens and field of view around the smallest defect you need to see.
Published supply evidence
The HIKROBOT MV-SC5120XM-00C-NNN example is a 12 MP monochrome C-mount smart camera. It illustrates a camera option for a fixed inspection station.
What to verify
Resolution on the part, contrast at line speed, and missed defects and false rejects on known samples.
Review this application →
Measure dimensions and profiles
Laser line profiling head above a metal step on a conveyor
Illustrative process · 3D laser profiling · scan line across the height step
How it works
A line-laser profiler records a cross-section. With controlled relative motion, successive profiles can be used to inspect a surface or measure height and profile.
Published supply evidence
The SinceVision SRI8055 lists a 55 mm reference distance and up to 67 kHz scanning. Yuezhan’s UFP-DR-V illustrates a complete fastener station when feeding and sorting are also required.
What to verify
Compare field width and depth range at the proposed mounting distance. Verify repeatability on the actual finish and at production speed.
Review this application →
Verify assembly configuration
An automated optical inspection station above an assembled printed circuit board
Illustrative post-reflow AOI station · assembled PCB on edge rails
How it works
Register the image to a board or fixture datum. Compare expected component locations and orientations, then inspect visible joints or surfaces from the required views.
Published supply evidence
The supply research found a DeepSight six-sided camera-module AVI system for connectors and flex circuits. The board image shows a related post-reflow AOI workflow, with exact station fit still to be checked.
What to verify
Use known-good and known-bad units to check defect coverage and false calls. Plan a separate check for joints hidden under packages.
Review this application →

Published specifications support initial selection. Confirm application performance, lead time, local support and integration scope with the supplier or integrator after reviewing your parts and site requirements.

Which route should you evaluate first?

Make two decisions: choose how to measure the defect, then decide how much of the station you need to buy.

2D image inspection

Start here
The defect changes visible contrast or the part outline.
Screen out if
The acceptance limit is a height or a depth that the image cannot reliably distinguish.
First acceptance check
Use known-good and known-bad parts at the required field of view. Record misses and false rejects at operating speed.

3D profile measurement

Start here
A height, step or cross-section determines acceptance.
Screen out if
The sensor cannot see the feature at the proposed angle, or the part cannot move through the scan as required.
First acceptance check
Confirm coverage and repeatability on the actual finish. Evaluate reference distance and depth range together.

Integrated inspection station

Start here
The scope also includes feeding, positioning, reject handling or line controls. A complete station can use 2D or 3D.
Screen out if
Your existing line already handles presentation, controls and rejection, and you only need an inspection module.
First acceptance check
Agree the feed presentation, line interface, reject confirmation and sustained throughput before comparing quotes.

How an inspection station makes the decision

Map the station from part presentation to a verified pass/fail action. Each interface can change the optics, controls or test plan.

  1. Present and trigger

    Fix the part pose or track its movement. Agree whether the PLC sends a part-present trigger and how the result is matched to that part.

    What we need to know Part position, fixture access and time available for capture.

  2. Capture the relevant feature

    For a visible edge defect, try controlled lighting and 2D imaging. For a height criterion, check the profiler’s working geometry and line of sight.

    What we need to know Smallest rejectable feature, field of view, surface finish and motion.

  3. Make and pass the decision

    Set the rule against known-good and known-bad samples. Pass the inspection result and validity to the line controller. Define what happens if a result is missing.

    What we need to know Acceptance rule, part-to-result tracking and the PLC handshake.

  4. Confirm the line action

    If the line ejects rejects, check that the correct part is removed and removal is confirmed. Run representative parts at production speed.

    What we need to know Misses, false rejects, wrong-part rejects and sustained throughput.

The first question we would ask

If you reject an aluminum housing by burr height, how much of the hole edge can the sensor see in the existing fixture? A 55 mm profiler reference distance helps check mounting feasibility. The sample test still has to show that the edge is measurable and that the measurement supports your reject limit.

See the example review →

Example review · burrs on an aluminum housing

A manufacturer needs to screen for burrs around a machined bore before assembly. The smallest rejectable burr, surface finish and available inspection time still need confirmation.

Example: A burr that changes the outline is a candidate for 2D imaging. A burr you reject by height may need 3D measurement.

Directional lighting and a 2D smart camera

First route to test if the burr changes the visible edge or casts a repeatable shadow. The HIKROBOT MV-SC5120XM-00C-NNN specification provides one 12 MP monochrome C-mount reference.

What to verify Check the smallest rejectable burr at the required field of view. Include glare, part variation and mounting position.

3D line profiling

Consider this route if the reject rule depends on burr height or a surface step. SinceVision’s SRI8055 lists a 55 mm reference distance.

What to verify Check that the sensor can see the edge at the available angle. Measure repeatability at line speed.

Integrated feed, inspection and rejection

Consider a complete station if presenting and separating parts are part of the job. Yuezhan’s UFP-DR-V is a fastener example of this architecture.

What to verify Verify handling for the actual housing, reject confirmation, part traceability and sustained throughput.

Suggested next step

Start with a 2D lighting test on known-good and known-bad parts. Add a 3D trial if height drives acceptance or the 2D view cannot reliably separate them.

Request an inspection review →

What to ask for in a comparable quote

Technical scope

Ask each bidder to list optics, lighting, part handling, reject hardware, controls and integration. Mark what you already have on site.

Acceptance criteria

Use the same good and defective samples, part variants, line speed and rules for missed defects and false rejects.

Delivery and total cost

Separate equipment, fixtures, software licenses, commissioning and support. Confirm the quote currency, lead time, installation location and responsibilities with the bidder.

How we can help

Choose the level of support that fits your decision.

Supplier sourcing

Screened supplier pool and industry contacts

We match your part, process and qualification needs against our screened pool of Chinese suppliers and industry contacts. We explain why candidates fit, flag gaps and help with introductions or quote requests where appropriate.

Planning estimate: 2–3 business days for an initial sourcing reply once we have enough detail to assess the request.

Technical advisory and China visits

Research, validation and on-site discussions

We help you compare technology routes, assess the Chinese supplier market and decide what to validate before committing. If an in-person visit would help, we can shortlist sites, prepare a technical agenda and coordinate supplier meetings or factory visits, subject to availability.

Planning estimate: 5–10 business days for a focused advisory report after scope and inputs are agreed. We confirm the delivery date before you commission work.

Share your project and we’ll confirm the scope, timing and any fees before work begins. Equipment, samples, travel and third-party testing are quoted separately where applicable.

Discuss your project →

Tell us what to inspect

Tell us what you need to inspect and where the system will be installed. Our team will reply with the approach worth evaluating first and the questions or sample checks that would narrow the choice. You can add drawings or dimensions later.

See a sample review →

What you can send us

A short note on the part, the reject rule and where inspection fits in the line. We can turn that into a first test, alternative routes and an interface checklist for the supplier or integrator.

Add dimensions or timing (optional)
Contact details
Add your name or company (optional)

We use your details to respond. We’ll ask before sharing your project with prospective suppliers.

Machine vision selection guides

2D vs. 3D Machine Vision Inspection →

Vision Camera vs. Complete Inspection System →

Questions before you start

What if I only have a photo and a description?

Start there. The smallest rejectable defect, the field of view and the available inspection time can be added when known.

Can I compare a component with a complete inspection station?

Yes. The comparison covers the imaging hardware and the work the rest of the station must do, such as presenting the part, triggering the inspection and handling rejects.

What about sample tests, quotes and installation?

The first step is defining the technical comparison and the test. Sample acceptance, quoted scope and local installation are confirmed for each project with the company responsible.

Leave a message

We use your details to respond. We’ll ask before sharing your project with prospective suppliers.